The Beginning. Site preparation
|
|
26' X 32' Concrete Slab
|
|
Framing the first outside wall
|
| 
Progress on framed wall sections
|
Exterior walls are up; sheathing started
|
| 
Structure framing is complete
|
| 
Roofing in 100 degree heat. Hosing down the shingles to keep them cool enough to work on.
|
|
Side double door to workshop.
|

Only window in the building. Put there for Air Conditioner.
|
| 
Front view of nearly completed exterior.
|
|
Side double door to workshop, now with siding installed.
|
|
Finished shop.
|